HOME FLOORPLANS HIGHLIGHTS SPECIFICATIONS PRICE LISTS / AVAILABILITY LINKS PHOTOS CONTACT US

SPECIFICATIONS

>OFFICE SPECIFICATIONS >RETAIL SPECIFICATIONS

WALLAll demising walls, exterior walls, columns and tenants demising partitions are taped and sanded drywall on metal studs.

STOREFRONTSupply and install interior/exterior window if any or storefront in accordance with the Landlord's Architect’s design.

FLOORSSteel troweled concrete.

PLUMBINGMain drain (underslab) and main water supply pipe to the Unit shall be available for the connection by the Tenant.

MECHANICAL SYSTEMEnergy conserving 4-pipe fan coil system (hot and chilled water sources supplied by Markham District Energy) combined with year round heating and cooling at a rate of approx. 1 Ton/400 square feet of leased premises. Individual temperature control zones 1 per approximately 1000 square feet. All HVAC distribution by Tenant.

POWER600 volt (60, 100 up to 400 amp) electrical service terminating at a disconnect switch in the main electrical room shall be provided by the Landlord. The Landlord's Electrical Engineer shall approve the electrical service for required usage.

SPRINKLER SYSTEMSprinkler line and head to meet NFPA13 code requirements shall be provided to the Leased Premises (unit).

GASMain gas service line for restaurant to meter location outside of the unit approved by Enbridge Gas (Note: All restaurants should use gas fired equipment for cooking only at a cost to themselves.).

METERSLandlord to provide individual sub- metering system to meter all electrical consumption for the Tenant’s leased premises at the Tenant’s expense. The Landlord at the Tenant’s cost will install sub-metering as required for restaurant use or any Tenant with above normal usage of water and HVAC.

 



© 2008, DTZ Barnicke